6.5 MWdc capacity, 11.7 GWh/year production, 3,700 tons of CO₂ saved
Altenia, as main EPC contractor, is building a 6.5 MWdc photovoltaic plant in Ginosa (TA) for Zelestra. The project will contribute to the energy transition with an annual production of 11.7 GWh and a reduction of 3,700 tons of CO₂. A green infrastructure that creates value for the territory.
Read the full news on LinkedIn.