Objective
STE Energy has built the electrochemical storage plant in Avetrana (TA), designed to provide Fast Reserve services to the national electricity system. The main purpose of the intervention was to increase the flexibility of the grid and the full integration of renewable sources, contributing to the stability and sustainability of the energy system.
Activity
- Design and construction of civil works and connections to the grid;
- System engineering and integration of supply components;
- Installation and commissioning of PCS and batteries;
- Functional tests and final commissioning.
Results
The project was completed on time, in full compliance with the required technical specifications, providing an innovative and reliable infrastructure to support the stability of the national electricity grid.
