Scope
STE Energy, a subsidiary of Altenia, has built a photovoltaic plant in Poggio Renatico (FE), a plant intended to increase the production of renewable energy and support the Italian energy transition.
Activity
- Design and construction of the photovoltaic field;
- Installation of 54,000 bifacial solar tracking solar panels and inverters;
- Civil and electrical connection works;
- Testing and final commissioning;
- Interventions for the enhancement of the territory and the community
Results
The plant, with a capacity of 25 MW, produces about 40 GWh of green energy per year, enough to meet the energy needs of about 15,000 households and avoid the emission of 17,000 tons of CO₂. Completed on schedule, the park confirms STE Energy’s excellence in the construction of large-scale photovoltaic plants.
