Two photovoltaic plants inaugurated in Montenero di Bisaccia (CB)

Built for REDEN, featuring advanced technical solutions and O&M management

Altenia has completed two high-efficiency photovoltaic plants for REDEN: Montenero 1 (6.15 MW) and Montenero 2 (7.9 MW), both equipped with tracker systems. The solutions address landscape and water constraints, with elevated substations and complex grid connections. Altenia will also manage operations and maintenance for the next two years.

Read the full news on LinkedIn.

Share

More news from Altenia

  • Altenia completed a revamping and repowering project

    A project that transforms existing infrastructure into sustainable solutions for the future of energy

    Find out more

  • Altenia realized a photovoltaic plant for Plenitude

    Plenitude announces the start of production of the 2.75 MWp photovoltaic plant

    Find out more

  • Altenia leads agrivoltaic development in Southern Italy

    Agreement signed with Repower for a 67.2 MW project in Ciminna (PA)

    Find out more