Scope
STE Energy, a subsidiary of Altenia, has built the Cantayus hydroelectric plant in Colombia, a project designed to enhance local water resources and increase the production of renewable energy.
Activity
- Supply and complete installation of electromechanical systems (Water to Wire);
- Assembly and commissioning of 2 Francis turbines of 10 MW each;
- Implementation of electrical connection and automation systems;
- On-site testing and commissioning.
Results
The plant was completed on time, ensuring operational reliability and compliance with the required standards, demonstrating STE Energy’s technical and organizational capacity in international hydroelectric projects.
