Scope: sustainable energy from the Misicuni plant, Bolivia
STE Energy, part of Altenia since 2026, has built the Misicuni hydroelectric plant, one of the most important infrastructures for Bolivia’s energy development. The plant, located in the Cochabamba region, was designed to enhance local water resources and ensure a sustainable supply of electricity.
Activity: electromechanical systems and three 40 MW Pelton turbines
- Supply and complete installation of electromechanical systems (Water to Wire);
- Assembly and commissioning of 3 Pelton turbines of 40 MW each;
- Implementation of electrical and automation systems;
- On-site testing and commissioning activities.
Results: plant completed on time and compliant to quality standards
The plant was built in compliance with the contractual deadlines and quality standards, confirming STE Energy’s technical and organizational capabilities and its contribution to the security and sustainability of the local energy system.



