Scope
STE Energy, company controlled by Altenia, has built the high-voltage substation in Serre di Tavazzano (LO), serving an energy storage system (BESS). The aim of the intervention was to enhance the reliability of the electricity grid and the full integration of the most modern storage technologies.
Activity
- Design and construction of the HV substation;
- Supply and installation of primary and secondary equipment;
- Connection to the existing network;
- Implementation of control, supervision and protection systems;
- Functional testing and commissioning.
Results
STE Energy completed the project by ensuring compliance with contractual deadlines and fully responding to the needs of the client, while ensuring greater stability and security to the electricity grid.
